The Village at Holston Building Watch.

Weather delays have stymied our efforts to build at Holston, but have no fear, the weather will turn soon, and new pictures will be on their way!


HomeSource VP of development Ken Block points to the location of the multifamily buildings on the upper section of the property. (Jan 2018)


The lower seat will hold 1-2 single family homes and the community room.  (Jan 2018)


The lower section of the property will remain wooded to protect the stream that runs through it. (March 2018)


Our detention pond is being tested by all the rain we have had in the past couple of weeks. (March 2018)


The pond is working, the creek is running clear, with no muddy water from the job site! (April 2018)

Here we see the drainage pipe being installed.  (May 2018)

The dewatering pipe drains the detention pond to the stream below.  (May 2018)

Here is the headwall of the pipe with energy dissipators.  (may 2018)

Viewing the site from Holston Dr. (Late May 2018)

Site of our soon-to-be supportive living house!  (Late May 2018)

Deep into work on the site.  (June 2018)

Posted on December 15, 2017 in KHP News